{"id":25777,"date":"2019-02-25T15:01:58","date_gmt":"2019-02-25T15:01:58","guid":{"rendered":"http:\/\/sicdigital.com.ar.ar\/sic\/?p=25777"},"modified":"2019-02-25T15:01:58","modified_gmt":"2019-02-25T15:01:58","slug":"el-costo-del-metro-cuadrado-de-construccion-roza-los-20-000","status":"publish","type":"post","link":"https:\/\/sicdigital.com.ar\/sic\/el-costo-del-metro-cuadrado-de-construccion-roza-los-20-000\/","title":{"rendered":"El costo del metro cuadrado de construcci\u00f3n roza los $20.000"},"content":{"rendered":"<p><a href=\"http:\/\/sicdigital.com.ar.ar\/sic\/wp-content\/uploads\/2019\/02\/cordoba.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-25778\" src=\"http:\/\/sicdigital.com.ar.ar\/sic\/wp-content\/uploads\/2019\/02\/cordoba-300x177.jpg\" alt=\"\" width=\"300\" height=\"177\" \/><\/a><\/p>\n<p>Durante enero, el \u00cdndice del Costo de la Construcci\u00f3n de C\u00f3rdoba (ICC- Cba) registr\u00f3 una variaci\u00f3n mensual del 2,64 por ciento en su Nivel General y del 48,96 por ciento en relaci\u00f3n al mismo mes del a\u00f1o pasado, seg\u00fan la Direcci\u00f3n de Estad\u00edsticas y Censos de la Provincia.<\/p>\n<p>De este modo, el costo del metro cuadrado para construir una vivienda tipo lleg\u00f3 a 19.732,49 pesos. As\u00ed, para edificar una casa familiar de 75 metros cuadrados, es necesario contar con casi 1,5 mill\u00f3n de pesos.<\/p>\n<p>En el primer mes del a\u00f1o, el costo de los materiales aument\u00f3 1,19 por ciento, y el de la mano de obra, el 4,12 por ciento. El rubro \u00abVarios\u00bb, se increment\u00f3 un 9,87 por ciento.<\/p>\n<p>En los \u00faltimos 12 meses, el precio de los materiales de construcci\u00f3n se encareci\u00f3 m\u00e1s del 60 por ciento, seg\u00fan datos de la Direcci\u00f3n de Estad\u00edsticas de la Provincia.<\/p>\n<p>&nbsp;<\/p>\n<p>Fuente: La Voz del Interior<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Durante enero, el \u00cdndice del Costo de la Construcci\u00f3n de C\u00f3rdoba (ICC- Cba) registr\u00f3 una variaci\u00f3n mensual del 2,64 por ciento en su Nivel General y del 48,96 por ciento en relaci\u00f3n al mismo mes del a\u00f1o pasado, seg\u00fan la Direcci\u00f3n de Estad\u00edsticas y Censos de la Provincia. De este modo, el costo del metro [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":25778,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","_joinchat":[],"footnotes":""},"categories":[97],"tags":[2816,3219,44,550,3078,4076,2649,4441,4469,3079,235,4661,11,334],"class_list":["post-25777","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construccin","tag-2816","tag-aumento","tag-construccion","tag-cordoba","tag-costo","tag-direccion-de-estadisticas-y-censos-de-la-provincia","tag-enero","tag-icc-cba","tag-indice-del-costo-de-la-construccion-de-cordoba","tag-mano-de-obra","tag-materiales","tag-materiales-de-la-construccion","tag-vivienda","tag-viviendas","et-has-post-format-content","et_post_format-et-post-format-standard"],"_links":{"self":[{"href":"https:\/\/sicdigital.com.ar\/sic\/wp-json\/wp\/v2\/posts\/25777","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sicdigital.com.ar\/sic\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sicdigital.com.ar\/sic\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sicdigital.com.ar\/sic\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sicdigital.com.ar\/sic\/wp-json\/wp\/v2\/comments?post=25777"}],"version-history":[{"count":0,"href":"https:\/\/sicdigital.com.ar\/sic\/wp-json\/wp\/v2\/posts\/25777\/revisions"}],"wp:attachment":[{"href":"https:\/\/sicdigital.com.ar\/sic\/wp-json\/wp\/v2\/media?parent=25777"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sicdigital.com.ar\/sic\/wp-json\/wp\/v2\/categories?post=25777"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sicdigital.com.ar\/sic\/wp-json\/wp\/v2\/tags?post=25777"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}